Paving permits, entrances, and stormwater rules in Kentucky

What Kentucky property owners should check before paving: site plans, stormwater permits for projects over one acre, road entrances, ADA, and 811.

By the Paving.KY editors · Updated 2026-11-23

Repaving an existing lot in the same footprint is often simple. A new parking lot, an expansion, a new entrance, or a major rebuild can involve several layers of approval. Here's what to check before work starts.

Local site plans and permits

For new lots, expansions, and layout changes, your city or county may require:

  • Site plan review by the planning office
  • Minimum and maximum parking counts for your type of business
  • Landscaping, lighting, and buffer requirements
  • Stormwater management for added paved area
  • Building or grading permits

Even straightforward repaving may need a permit in some places. Check with your local planning and building offices early.

State stormwater permits: one acre or more

Under the federal Clean Water Act, Kentucky requires construction projects that disturb one acre or more of land, or are part of a larger development that will, to have stormwater permit coverage through the Kentucky Division of Water. That generally means filing a Notice of Intent and following an erosion and sediment control plan.

Some cities and counties with their own stormwater programs regulate smaller sites too.

Road entrances

Where your lot or driveway meets a public road, the road owner may need to approve the entrance:

  • City streets: city public works or engineering
  • County roads: the county road department
  • State highways: the Kentucky Transportation Cabinet, which handles permits for work and entrances in state right-of-way

Rules often cover entrance width, spacing from intersections, sight distance, and drainage under the entrance.

ADA

Resurfacing, resealing, or adding spaces to a lot generally triggers ADA requirements for accessible parking and routes. See ADA parking requirements.

Call 811 before digging

Kentucky law requires anyone excavating to notify utilities through 811 at least two full business days, and no more than ten, before starting work. Milling, base repair, curb work, and drainage work all count. Private lines, like parking lot lighting and irrigation, usually aren't marked by 811.

Fire lanes

Your local fire department may require marked fire lanes and access for fire trucks, especially on new lots or changed layouts.

Who handles it?

On larger projects, an engineer often prepares site plans and stormwater plans, and the contractor or engineer handles permits. Make sure your bid and contract say who's responsible for each permit.

The bottom line

For anything beyond repaving in the same footprint, check local permits, stormwater rules, and road entrance approvals early, and get ADA requirements into the plan. See how to hire a paving contractor.

This is general information, not legal advice.